BE data, a division of BE Power, was established to leverage and pivot the group’s power capability into data centre development.
The first BE data project is the renewable-powered Big-Y, a 50MW (stage 1) immediate start behind-the-meter data centre designed to meet the growing demand for sustainable, reliable and scalable digital infrastructure.
Big-Y at a Glance
- Location: Yarranlea, Southeast Queensland
-
Solar Capacity: Up to 136MW
- Data Centre Capacity: 50-100MW
- BESS Capacity: 100MW
- Network Resilience: Dual transmission line connection
- Connectivity: Multiple fibre connection options
- Access: Flood-free transport links and proximity to Brisbane and Toowoomba
PROJECT ENQUIRIES
Enquiries: enquiries@bepower.com.au
Project hotline: 1800 853 280
