Dubbo, NSW Power Project

The Dubbo project is a permitted site with utility connection and connection agreements. We have identified in conjunction with the local utility the capacity to extend the plant by approx. 10MW. We are currently sourcing the additional land.

AMP Control have re-engineered the project.

Name Plate Capacity: 11.6MW
Energy Production (E-Grid): 22,168MWh p.a.

Comments are closed.